Road Reconstruction Project

The Road Reconstruction program will include curb and gutter, sidewalk and drainage improvements associated with the roadway improvements.  However, it also included the entire removal of the pavement section and reconstruction of the roadway.  There are numerous roadways within the City limits that were constructed in the 1970's/1980's with a material that, while acceptable at the time, has been proven to not provide the structural integrity needed for roadway sustainability.  City Staff and the City Engineer are working on developing a multi-year program to address these areas in conjunction with other capital projects.  Currently, a 3-year program has been developed.  In upcoming year(s) staff will develop a longer range plan for roadway reconstructions.
Maple2

2017 Reconstruction Information

Weekly updates (As of 10.11.2016 no updates to report)

FAQs and other things to know